Saturday 27 November 2010

a bit more loom & start of cooling circuit

The Sierra's original wiring for the indicator stalks has been labelled up for reference. The stalks have been re-attached to the column but not yet soldered to the premier loom as I'm still looking at how best to support the bulk of the loom under the scuttle area.


The rear loom has been wrapped in split conduit and attached along the inside of the transmission tunnel using cable ties and bases.


I've made a start on the cooling circuit using the silicon hoses and aluminium tubing. On the ends of the tubing I put a few indentations using a plumbing tool which should prevent the hoses from slipping off. (another tip I picked up from locostbuilders!)




No comments:

Post a Comment