Tuesday 18 October 2011

Various Jobs

The front suspension has now been put back together after fitting the new rubber boots to all the ball joints. I've since started to make a panel for the back shelf using some 4mm black pp sheet.


Tonight, I made some brackets from stainless plate which support the handbrake cables. These are positioned either side so that the cables are well clear of all the chassis rails and won't come into contact with the top wishbones. I noticed these flex a little when activating the handbrake so the plan is to swap the rivets out for bolts through the box section.

No comments:

Post a Comment